Daytime Noise Monitoring Results
Station M8, Wah Lai House                    
Date Start Time End Time  Weather Noise level (dB(A)), 30 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
03-Aug-10 09:46 10:16 Sunny 66 67 64 Pipe pilling works Road Traffic noise from Shek Pai Wan Road. N.A 29 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
13-Aug-10 14:07 14:37 Sunny 65 66 62 Pipe pilling works Road Traffic noise from Shek Pai Wan Road. N.A 30 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
17-Aug-10 10:18 10:48 Sunny 65 66 62 Pipe pilling works Road Traffic noise from Shek Pai Wan Road. N.A 28 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
25-Aug-10 13:19 13:49 Sunny 65 67 64 Pipe pilling works Road Traffic noise from Shek Pai Wan Road. N.A 28 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
31-Aug-10 09:43 10:13 Foggy 65 67 63 Pipe pilling works Road Traffic noise from Shek Pai Wan Road. N.A 30 <5 B&K 2238   S/N : 2684502 B&K 4231  S/N: 2385180
      Min. 65                
      Max. 66